THE INAUGURATION CEREMONY OF YONGYANG SPECIAL STEEL ,SOUTH TO NORTH WATER TRANSFER PUMP STATION WAS HELD CEREMONIOUSLY
Release time:2022-12-26

  On May 8, 2018, the ribbon cutting ceremony of Yongyang South to North Water Transfer Pump Station was held ceremoniously. Du Qingshen, chairman of the company, participated in the ribbon cutting, pressed the equipment start button and made an important speech. Du Xiaofang, leader of Yongnian District and general manager of the company, cooperated with factory directors of Yongyang to participate in the ribbon cutting ceremony. The project adopts the pressurized water conveyance mode. The diameter of the main pipe is DN700, the design internal pressure of the pipe is 0.9-1.6Mpa, and the design flow is 0.38m3/s, which can meet the water demand of the West Special Steel Project of 841m3/s.

INNOVATION ,CUTTING-EDGE TECHNOLOGY ,LEADING INDUSTRY DEVELOPMENT
LIGHT RAIL, HEAVY RAIL, CRANE RAIL, RAILS ACCESSARIES, I-BEAM/U-BEAM FOR MINING/TUNNELING PURPOSE, FLAT SPRING STEEL BAR, ROUND BAR, SQUARE BAR, BEARING/TOOL ROUND STEEL BAR.
Application industry: port and wharf, logistics and transportation, railway transportation, lifting machinery, mining, roadway, industrial production, chemical industry, non-ferrous metal smelting and processing.
Contact us →

Andy

Johnny

WeChat

WeChat

Johnny